Qatar .fr

Actualité et Informations

Mechanical Quantity Surveyor

  1. ROLE DESCRIPTION
  2. Duty

  • accurate and complete material quantity take off of mechanical drawings including but not limited to Hvac, Plumbing ( Water & Drainage ), Irrigation and Firefighting system.
  1. Responsibility and Authority

  1. Responsibility
  • Review and check list of drawings ( in Cad files) are available before starting the quantity take off.
  • Any missing drawings shall immediately subject to prepare list of clarifications to be submitted to Tender/Estimation Manager.
  • Coordinate material take off to Estimator/ Mechanical.
  • Prepare quantity take off sheet.
  1. Authority
  • Direct reporting to Tender & Estimation Manager and or Operation Manager
  1. Required Competencies 
  • Ability to prepare quantity take off in excel sheet in orderly manner complete with item description, quantities, per area , per floor.
  • Knowledgeable of advance quantity take off software and with fast and accurate output.
  • Ability to adhere on or before submission date.

Job Details

Posted Date:2025-10-30
Job Location:Qatar – Doha
Job Role:Mechanical Engineering
Company Industry:Management Consulting

Preferred Candidate

Suite de l’annonce…